Extending Substation Life in an Aging Grid



Summary: The engineers behind post-war electrical grid expansion built substations with the understanding they would carry the country through the end of the century. But more than two decades into the 21st century, many of those aging substations need attention. Should they be replaced or can their lives be extended?


If a local electric grid were a human body, its heart would be the substation. Substations are the workhorses of the modern grid, supplying electricity to homes and businesses across the country. Keeping them operational for as long as possible makes sense, given how expensive replacement is.


Here's the challenge we face: a good portion of the substations currently operating in North America were built during the construction boom of the post-war era. They were only designed to last 30 to 40 years. But now we are looking at 50-60 years of service for some of the oldest projects.


The Big Question


Project owners and utility stakeholders find themselves facing a dilemma as they ponder the state of their aging substations: do they tear older substations down and replace them, or do they find a way to extend their lives for another few decades?


Building a brand-new substation costs a lot of money. Tearing down an existing station and replacing it entirely is even more expensive. Complete replacement also tends to cause significant power outages during construction. The good news is that modern technologies make it possible to extend the life of an aging substation by 20 years or more.


An entire industry has now grown up around what is referred to as Substation Life Extension (SLE). If you are a project owner or utility stakeholder, it is in your best interest to learn as much as you can about extending substation life.


Assessing Existing Substations


A thorough assessment of the existing substations should precede any decision to pursue SLE in a system. Think about it in terms of medical care. Before subjecting a patient to knee replacement surgery, a doctor would conduct a comprehensive assessment to determine whether surgery is the best option.


Assessments usually start with a substation transformer. The transformer is the heart and soul of the substation, for obvious reasons. A good way to test its health is to take a look at the oil inside it.


Transformer oil acts as both a coolant and an insulator. A healthy transformer will have oil that is free of dissolved gases and other impurities. Clean oil indicates good transformer health. Oil impurities suggest at least some degradation.


Engineers can also use infrared thermography to look for transformer hotspots. A hot spot would indicate high resistance and the potential for subsequent failure. Here is the thing: spending $50 to replace a bad part can protect a transformer against a half-million-dollar failure down the road.


Replacing Targeted Equipment


Assessing a substation gives engineers a picture of the facility's overall health. Sometimes an assessment dictates complete replacement. But more often than not, merely replacing targeted equipment will add years to a substation's life.


Another way to say it is this: it is not always necessary to replace everything. In most substations, it's just a small number of components that cause the majority of the problems. Circuit breakers, bushings, and tap changes are routinely problematic. But they are also easy and inexpensive to replace.


Replacing legacy oil circuit breakers with vacuum breakers is a worthwhile investment. Vacuum breakers are more reliable and require virtually no maintenance once installed. Best of all, they usually sit on the same footprint as the older breakers they are replacing. That makes installation fast and easy.


As for bushings and tap changes, they wear out sooner than the rest of a transformer's tank. Replacing them enhances transformer reliability at a fraction of the cost of a new unit.


Upgrading Protection With a Digital Brain


Going digital in terms of control and protection systems is perhaps the most effective way to extend the lifespan of an aging substation. It is also one of the most common SLE strategies in the industry.


A digital upgrade involves replacing legacy electromechanical relays with modern digital systems. Modern relays are actually microprocessors. They not only perform the same function as their legacy counterparts, but they also generate a ton of data engineers can use for a variety of purposes. A digital upgrade essentially gives a substation an electronic brain.


There are three key benefits to this particular upgrade:


  • More Informed Decisions – Better and more complete data leads to more informed decisions. In addition, digital systems can be accessed remotely. Engineers and decision-makers alike can know exactly what is going on with a substation without having to actually visit it.


  • Faster Responses – A digital brain facilitates much faster responses at the relay level. We are talking milliseconds rather than seconds. Faster responses increase reliability and reduce transformer wear and tear.


  • Less Maintenance – Legacy relays need to be manually calibrated every year. They also need to be replaced more frequently. Meanwhile, digital relays last longer and tell engineers when they are malfunctioning. It all leads to less maintenance.


The Substation's Bones


Finally, it is important to consider an existing substation's bones. Is the concrete foundation still in good condition? Are steel structures free of defects? Is the grounding grid suffering from corrosion, or is it still in good health?


Sometimes, the bones of a substation are degraded to the point that rehab is impractical and financially nonviable. On the other hand, if routine maintenance and a few minor repairs can bring the bones up to spec, there may not be a need to tear down and replace the substation.


Physical security must also be considered in terms of a substation's bones. Both human intruders and animals need to be kept out at all times. Improving physical security might be a simple matter of some upgrades. But an inherently insecure substation might never be fully secured no matter what engineers try.


Substation replacement is inevitable in some cases. But thanks to new technologies and different ways of doing things, our industry has figured out how to extend substation life by decades. Aging substations can be modernized at lower financial and productivity costs than ever before, making SLE a viable option for maintaining a grid originally designed to last only until the end of the 20th century.


FAQs


What substations are good candidates for lifespan extension?


As long as a substation's transformer and steel structures are in good physical condition, it is a good candidate for lifespan extension. Targeted equipment can be replaced easily and cost-effectively.


Is a modernized substation still reliable?


In most cases, yes. Modernization can make an aging substation as reliable as a brand-new one. But older transformers are always subject to failure.


How long does a typical SLE project take?


Every project is different. Completion can be in as little as a few months with only a couple of days of actual downtime.


Can SLE modernization include adding renewable energy?


The short answer is 'yes'. However, integrating renewables – especially solar – requires a significant relay upgrade.


Does SLE impact insurance rates?


Like modernization projects, every insurance carrier is different. A general rule suggests that carriers view substation upgrades as favorable.