Commonwealth provided commissioning services for the Hoover Heating Plant. The Hoover Heating Plant includes four steam boilers, which supply steam to several buildings in the University of Michigan’s south campus area, including many Athletic facilities. The existing 1500 BHP Boiler 4 at Hoover Avenue Heating Plant was replaced with a new 500 BHP dual fuel unit including new combustion air fan installations. The existing Boiler 4 and affected systems were demolished to make space for the new boiler and its systems. An exterior building wall was temporarily opened to remove the existing boiler and for installation of the new 500 BHP boiler. The existing Boiler 3 was also retrofit with a new Fireye-Nexus controller.

Among commissioning activities was verification that the boiler is installed in the proper location and that required clearances for maintenance and safe operation have been maintained. After installation and before startup, the boiler was cleaned of scale, grease, etc., and boil out performed in a manner and for the duration recommended. During commissioning of the boiler, the Contractor demonstrated operation of all boiler controls. At completion of startup written record of startup performance including percent CO2, CO, and O2, stack temperature, and combustion efficiency. The instrument verification included those provided with the boiler package as well as those supplied by the contractor. Additional items to confirm prior to start-up included all control system functions for Boiler 4 and all interlocking systems are programmed and operable, piping system flushing complete, water treatment system complete and operational, punch list items corrected, functional test procedures have been developed and approved, safety relief valves are installed and operating ranges confirmed.

This solution applied the following service(s):

This solution was implemented in the following market(s):

We are committed, both as a firm, and as individuals to influencing and shaping the secure energy future.

Gary Bernstein, P.E.
Vice President & Chief Marketing Officer

Contact us